  1. Developing a Model for Determining the Optimal Replacement Timing of Hauling Fleet in Open-Pit Mining Based on Real Options Method
    Hasan Qahremanizade 2025
  2. Integration of Geological Block Model Clustering with Production Planning Models for Locating Semi-mobile Crushing and Conveying (SMIPCC) systems (Case Study - One of the Iranian metal mines)
    Yousef Kanani 2025
  3. Analysis of Sustainable Development Indicators in Quarry Mines Exploitation with Emphasis on Environmental Issues in Gilan Province
    Khatereh Ghasemzadehdehbaneh 2025
  4. Enviromental Impact analysis of mine waste management approaches (Case study: quarry mines in Gilan province)
    IRAJ YOUSEFI KOLAVANI 2025
  5. Blasting Improvement in Zahabad underground lead and zinc mine
    Mahdi Haji ashrafi 2024
  6. Semi-mobile- In-Pit Crushing and Conveying (SMIPCC) planning and design (Case Study:One Of metalic Mine In Iran)
    Hasti Heydarzade 2024
  7. Application of Geostatistical simulation in mine Stockpiles estimation
    Erfan Chavosha 2024
  8. Optimization of blasting operations with emphasis on improving crushing in Ganjeh stone mine
    Seyes amir farnish Hashemi nodehi 2023
  9. Efficiency analysis of Mining cooperation with Data Envelopment Analysis at Iran Decorative stone Industry
    Mehrnaz Goodarzirad 2022
  10. Feasibility Study of Kermanshah Steel with Real Options Approach
    Pourya Niknami 2022
  11. Truck-shovel optimum allocation in surface mines with PSO meta-heuristic algorithm
    Fazel Mousazad lotomi 2022
  12. Technical and economic analysis of a concrete batching construction in the underground of Angooran lead & zinc mine.
    Majid Kazemi 2021
  13. The effects of waste/ore pass excavation on angoorn underground mine ventilation network
    Majid Fetri 2020
  14. Ultimate pit limit Analysis based on combined effects of price and grade uncertainty
    Amir Jalalat vakil kandi 2020
  15. Optimization if Shovel-Truck distribution system with Integer linear programming based on improvement of shovel efficiency.
    Mohammad Javad Ababafha 2020
  16. Optimization Of Drilling and Blasting by Using Air-Deck in Anguran lead & zinc open pit mine
    Mostafa Zarei 2020
  17. Selection of suitable mining method by combining the experimental methods with Fuzzy PROMETHEE technique (case Study : Anomaly No. 12A Bafgh)
    Sajjad Dargahpoor 2020
  18. Designing blastholes pattern in Golaly iron by analyzing of fragmentation of blasted rocks and fly rock using artificial neural network and adaptive neuro-fuzzy inference system
    Kaivan Zafari zafarabad 2019
  19. Strategic planning And Placement analysis Of Iron & Steel Chain In Afghanistan
    صالح محمد صالحی 2019
  20. Investigation Performance of Fuzzy-Neural Network Models in Forecasting the price of Precious Metals (Case Study: Gold, Silver, Platinum and Palladium)
    عبدالصبور محمودزاده 2019
  21. Reliability and maintainability study of Mining Equipment (case study: songun copper mine)
    Reza Razzaghzadeh 2019
  22. Method selection and underground mine plan design of darreh zereshk copper mine
    Seyyedeh masoumeh Mousavi nezhad 2018
  23. The stability analysis of upstream and downstream slopes in road overlooking to Haraz dam
    Mehrdad Shaghelani Loor 2018
  24. Forecasting penetration rate of tunnel boring machine (TBM) using adaptive neuro-fuzzy inference system
    Ali Zarabadipour 2018
  25. The effect analysis of mine cutoff grade based on maximization of NPV to low grade stockpile place changes. (case study: zarshuran gold mine.)
    Siamak Saadati 2018
  26. طبقه بندی کیفی پلاک های سنگ تزئینی به روش سیستم استنتاج فازی
    Mehdi Bazesh 2018
  27. برنامه ریزی تولید معادن بر مبنای کاهش ریسک عدم قطعیت عیاری (مطالعه موردی : آنومالی 3 معدن رگه ای مس تکنار)
    HOSSEIN HAMDAD FARAMARZI FARZIN 2017
  28. ارزیابی ریسک بسته شدن پیش از موعد معدن با استفاده از روشهای تصمیم گیری چند معیاره فازی (مطالعه موردی:معدن چادرملو)
    Farhang Vesal 2017
  29. بررسی امکان کاهش هزینه های سیستم ترابری معدن روباز سرب و روی انگوران مبتنی بر استفاده از فضاهای زیرزمینی موجود
    Abbas Tadayon Mansouri 2017
  30. کاهش ریسک عدم قطعیت قیمت در برنامه ریزی تولید بلند مدت معادن رو باز با استفاده از مبانی رویکرد پتانسیل بالادست ریسک پایین دست
    Mostafa Hejazifar 2017
  31. بکارگیری تکنیک اختیارات حقیقی در ترتیب استخراج بلوک های معدنی روباز تحت شرایط عدم قطعیت قیمت
    Mohammad hossein Sadeghzadeh 2017
  32. بهینه سازی عیار حد بر مبنای حداکثرسازی NPV با بکارگیری الگوریتم ژنتیک (مطالعه موردی: یکی از معادن فلزی ایران)
    Mohammad Reza Ahmadi 2017
  33. بهینه سازی حمل و نقل در زنجیره تولید صنعت سنگ کشور بر مبنای کاهش هزینه انتقال مواد و محصولات نهایی
    Ashkan Ghasemi dolat abadi 2017
  34. ارائه سیستم استنتاج فازی ارزیابی ایمنی گازها در تونلهای راه جهت هوشمندسازی عملیات تهویه ( مطالعه موردی : تونل امامزاده هاشم)
    Ali Azizmohammadi 2016
  35. تعیین شاخص ایمنی هوای معدن بر مبنای روش ارزیابی جامع فلزی
    Kamran Banaei 2016
  36. بکارگیری روش شبیه سازی الگوریتم ژنتیک در بهینه سازی توزیع هوا در شبکه تهویه معادن (مطالعه موردی : معدن زغال سنگ کلاریز )
    Hossein Larijani 2016
  37. طراحی سیستم تهویه هوشمند بخش زیرزمینی سرب و روی انگوران
    Seyyed mostafa Pazin fooshazdeh 2014